Investor Relations

News

26/11/2024 Altech Batteries GmbH concludes letter of intent (LOI) with Enertrag SE and Energiequelle GmbH for the delivery of 160 CERENERGY GridPacks with 1 MWh capacity each read more
31/10/2024 Altech Advanced Materials AG – Final result of the capital increase read more
28/10/2024 Rights issue capital increase with subscription rights amounting to EUR 788 thousand completed through the issue of 328.432 shares from authorized capital – the private placement runs until October 31, 2024 read more
02/10/2024 Altech Advanced Materials AG – Capital increase of up to EUR 3,5 million through the issue of up to 1.460.500 shares from authorized capital read more
12/09/2024 Altech Advanced Materials AG – Conclusion of a letter of intent (LOI) with Industriepark Schwarze Pumpe eV for the supply of CERENERGY battery packs read more
09/07/2024 Preliminary half-year results as of June 30.06.2024, XNUMX read more
22/03/2024 Altech Advanced Materials AG: Correction of preliminary annual results as of December 31.12.2023, XNUMX read more
20/03/2024 Altech Advanced Materials AG publishes results of final feasibility study for CERENERGY battery plant read more
23/01/2024 Altech Advanced Materials AG – Preliminary annual results as of December 31.12.2023, XNUMX read more
X

© 2024 Altech Advanced Materials | Website design by concise.digital