26/11/2024 | Altech Batteries GmbH concludes letter of intent (LOI) with Enertrag SE and Energiequelle GmbH for the delivery of 160 CERENERGY GridPacks with 1 MWh capacity each | read more |
31/10/2024 | Altech Advanced Materials AG – Final result of the capital increase | read more |
28/10/2024 | Rights issue capital increase with subscription rights amounting to EUR 788 thousand completed through the issue of 328.432 shares from authorized capital – the private placement runs until October 31, 2024 | read more |
02/10/2024 | Altech Advanced Materials AG – Capital increase of up to EUR 3,5 million through the issue of up to 1.460.500 shares from authorized capital | read more |
12/09/2024 | Altech Advanced Materials AG – Conclusion of a letter of intent (LOI) with Industriepark Schwarze Pumpe eV for the supply of CERENERGY battery packs | read more |
09/07/2024 | Preliminary half-year results as of June 30.06.2024, XNUMX | read more |
22/03/2024 | Altech Advanced Materials AG: Correction of preliminary annual results as of December 31.12.2023, XNUMX | read more |
20/03/2024 | Altech Advanced Materials AG publishes results of final feasibility study for CERENERGY battery plant | read more |
23/01/2024 | Altech Advanced Materials AG – Preliminary annual results as of December 31.12.2023, XNUMX | read more |
© 2024 Altech Advanced Materials | Website design by concise.digital